enquiries@harveygroup.co.uk 028 9034 2444

Portfolio

  • Highgate Newtown Community Centre (HNCC)

    Highgate Newtown Community Centre (HNCC)

    Harvey Group PLC have started works on the new Highgate Newtown Community Centre (HNCC) and fresh youth academy.  The £16m…

    Read more

  • Ulidia Integrated College

    Ulidia Integrated College

    Harvey Group have been appointed to Design, Develop and Install the M&E Services at Ulidia Integrated College. This new £20m…

    Read more

  • Lismore Comprehensive School

    Lismore Comprehensive School

    Harvey Group PLC have been selected to Design, Develop and Install the M&E Services for Lismore Comprehensive School, a new…

    Read more

  • Goathill Care Home

    Goathill Care Home

    Harvey Group PLC are working closely with the Main Contractors, McLaughlin & Harvey to deliver the mechanical & electrical building…

    Read more

  • St Joseph’s Crossmaglen

    St Joseph’s Crossmaglen

    Works are entering the final phase for the installation of M&E services on the new St Joseph’s High School, with…

    Read more

  • SRC Banbridge

    SRC Banbridge

    The £15 million campus for Southern Regional College Banbridge features 4500m2 of outstanding learning facilities which include a dedicated learning…

    Read more

  • James Park Warehouse

    James Park Warehouse

    Harvey Group successfully completed the mechanical & electrical services installation on this new 76,073ft² industrial unit, incorporating offices, welfare facilities…

    Read more

  • City Quays 3 – Belfast

    City Quays 3 – Belfast

    At 250,000 square feet City Quays 3 is one of the largest Grade A office developments to be built in…

    Read more

  • Hendon Hall Care Home

    Hendon Hall Care Home

    Harvey Group were engaged to deliver the M&E services on this 102-unit luxury care facility, for Signature Senior Lifestyle Limited.…

    Read more

  • Royal College of Pathologists

    Royal College of Pathologists

    Harvey Group PLC completed the design development and installation of MEP Services, on the new London Headquarters for The Royal…

    Read more

  • Green Pastures Church – Phase 1

    Green Pastures Church – Phase 1

    Harvey Group PLC worked alongside Martin & Hamilton and Delap & Waller to develop and install the M&E building services…

    Read more

  • Stanmore Care Home

    Stanmore Care Home

    Harvey Group deliver the M&E design, installation and commissioning on the Jewish Care Sandringham Development in Stanmore. Working alongside McLaughlin…

    Read more

  • Camden Schools

    Camden Schools

    The redevelopment of the Parliament Hill Schools including William Ellis, La Swop and Parliament Hill caters for over 1,250 students.…

    Read more

  • Pharmaceutical Facility (Larne)

    Pharmaceutical Facility (Larne)

    The expansion of a large Pharmaceutical Facility  located at Larne Harbour saw the extension of existing facilities to provide new…

    Read more

  • Central_School_Speech_Drama_6

    Royal School of Speech & Drama

    Harvey Group PLC developed and installed the Mechanical & Electrical building services at the new Royal Central School of Speech…

    Read more

  • Sevenoaks School

    Sevenoaks School

    The new Science & Technology Sixth Form Centre located in Sevenoaks School - Kent. brought together all four core fields…

    Read more

  • Luton Airport

    Luton Airport

    Harvey Group are the appointed Contractors, responsible for the design, development, installation & commissioning of the Mechanical & Electrical Services. This…

    Read more

  • Concentrix Offices Belfast

    Concentrix Offices Belfast

    The project comprised the design, refurbishment and extension of the existing Maysfield Leisure Centre which now forms a state-of-the-art office…

    Read more

  • University of Ulster New Teaching Block Magee Campus

    University of Ulster New Teaching Block

    This new £11-million-pound teaching block provides facilities for 4,300 students within University of Ulster’s Magee Campus located in Derry/Londonderry. This…

    Read more

  • Marriott Hotel Belfast

    Marriott Hotel Belfast

    The new hotel is Marriott International’s first in Northern Ireland, joining the company’s portfolio of nearly 4,500 hotels located in 87 countries and…

    Read more

  • Parklands Community Primary School – Chichester

    Parklands Community Primary School ̵

    This new Modular building provides 8 new classrooms, small hall/studio, library/ITC, staff room and all other associated facilities in a…

    Read more

  • Anfield Stadium Store

    Anfield Stadium Store

    Work on Liverpool FC’s new flagship store at Anfield is complete in time for the start of the new season 2017/18. Harvey Group…

    Read more

  • Dublin Road Student Accommodation Belfast

    Dublin Road Student Accommodation Belfas

    Harvey Group worked alongside O’Hare & McGovern in delivering this new build Student Accommodation in South Belfast. Works commenced on…

    Read more

  • GQ6C6794

    North Foreshore Studios Belfast

    The North Foreshore of Belfast Lough is former landfill facility which has been transformed into the largest development site in…

    Read more

  • B2 City Quays Belfast

    B2 City Quays Belfast

    City Quays 2 is the second phase of the 10-hectare City Quays development in Belfast Harbour and offers a Grade…

    Read more

  • Cleaver House Belfast

    Cleaver House Belfast

    Refurbishment & alteration works are completed on our Cleaver House Project. This existing 6 Storey Building, has been renewed into prime Category B office accommodation in…

    Read more

  • Lynch Hill Academy, Slough

    Lynch Hill Academy, Slough

    Lynch Hill Academy, which started on site in January 2016, is a modular build construction comprising works both in Northern…

    Read more

  • Furness House London

    Furness House London

    The redevelopment of Furness House provides modern open plan office accommodation over 4 floors. The newly equipped CAT A offices…

    Read more

  • Student Accommodation College Square East, Belfast

    Student Accommodation College Square Eas

    This Design and Build project involved the refurbishment of the old BIFHE Building, at College Square East, in the heart…

    Read more

  • Castlecourt Offices

    Castlecourt Offices

    The redevelopment of the Castlecourt Offices provides modern open plan office accommodation over the second, third and fifth floors. During…

    Read more

  • Waterfront Hall

    Waterfront Hall

    In partnership with McLaughlin & Harvey, this 68 week project was successfully completed in March 2016. We have a long…

    Read more

  • Ballymena Health Care Centre

    Ballymena Health Care Centre

    Ballymena Health Care Centre is Northern Ireland's First Combined Health & Social Care Centre and is now the largest facility…

    Read more

  • Girdwood Community Hub

    Girdwood Community Hub

    Girdwood Community Hub, located in the heart of Belfast, was successfully handed over in November 2015. The project culminated in…

    Read more

  • SERC – Performing Arts & Technology Centre

    SERC – Performing Arts & Tech

    The new £12 million facility will boost education and training across three areas creative industries, computing and engineering. Mechanical services…

    Read more

  • Windsor Walk London

    Windsor Walk London

    This Institute is a 5,255m┬▓ centre of excellence and is occupied by King's College Hospital. This building rehouses the world…

    Read more

  • PWC

    PWC Belfast

    We have been fortunate to contract the refurbishment of several PWC offices. In 2013, we undertook the installation of services…

    Read more

  • Kingspan Stadium Belfast

    Kingspan Stadium Belfast

    The Home of Ulster rugby, underwent a transformation and we were fortunate to deliver the M&E services on this Design…

    Read more

  • University of Ulster Belfast

    University of Ulster Belfast

    The New Block BA & BB is a nine-storey building split into a six-storey base and an upper level studio…

    Read more

  • Wellcome Wolfson Centre of Experimental Medicine

    Wellcome Wolfson Centre of Experimental

    Wellcome Wolfson Centre is a state of the art, purpose-built healthcare related building, located on the Health Sciences Campus, Belfast…

    Read more

  • Sheffield Hallam University Heart of the Campus

    Sheffield Hallam University Heart of the

    The Heart of the Campus Building was a New 3 storey development which consisted of Spacious Classrooms, PC Labs, Lecture…

    Read more

  • Deloitte Technologies Belfast

    Deloitte Technologies Belfast

    This interior refurbishment and high quality fit-out of 3 floors formed open plan and cellular offices, a technology showcase room…

    Read more

  • Churchill School Suffolk

    Churchill School Suffolk

    The new building is part single storey/part two storey block, that comprises hub-style learning clusters for each year group. These…

    Read more

  • Foyle Arena

    Foyle Arena

    Foyle Arena is a new leisure and events arena located in St Columb's Park, Derry. The state of the art…

    Read more

  • 8 Lanyon Plaza Belfast

    8 Lanyon Plaza Belfast

    This central Belfast project was a fast pace fit out of an existing superstructure in Lanyon Place. The project was…

    Read more

  • Grindon Hall School Sunderland

    Grindon Hall School Sunderland

    A new accommodation block was needed as part of the expansion to the existing facilities at Grindon Hall due to…

    Read more

  • Turemo1

    Terumo Production Cleanroom, Larne

    The development of the Turemo Cleanroom alongside Lagan Construction, incorporated a new clean room for Autoclave facilities, environmental controlled storage…

    Read more

  • University of Sheffield Engineering Graduate School

    University of Sheffield Engineering Grad

    This project is the centre of the faculty's postgraduate research and postgraduate teaching activities. The Graduate School house's collaborative and…

    Read more

  • Titanic Museum

    Titanic Museum

    Main Contractor: Harcourt Construction Site Management Office Sydenham Road Belfast BT3 9DJ 028 9040 9960

    Read more

  • Belfast Metropolitan College

    Belfast Metropolitan College

    The new Belfast Metropolitan building combines classrooms and training facilities for 2,500 students with commercial suites, offices, a library, cafes,…

    Read more

  • St Mary’s College

    St Mary’s College

    St Mary's College in Derry provides a hi-tech campus at the heart of the digital corridor on the Northland Road.…

    Read more

  • St Cecilia’s College

    St Cecilia’s College

    This project consisted of the provision of the complete mechanical & electrical installation for the new build replacement schools for…

    Read more

  • St Patrick’s Grammar School

    St Patrick’s Grammar School

    St Patrick's Grammar School based in Downpatrick is approximately 9,900m┬▓ and has 700 pupils. Harvey Group formed part of the…

    Read more

  • PRONI

    PRONI

    The Public Record Office of Northern Ireland (PRONI) is the Official archive for Northern Ireland. Located in Belfast Titanic Quarter,…

    Read more

  • Patton_Grosvenor%20Main

    Grosvenor Grammar School

    This project is a new 2 storey build which was integrated into existing Ken Reid science building. This was Procured…

    Read more

  • 1

    Portadown CTCC

    The Portadown Community Treatment and Care Centre is the first facility of its kind to open in Northern Ireland providing…

    Read more

  • Picture1

    ARC Apartments

    This new build project consisted of 500 apartments and commercial units within 6 multi- storey blocks. The ARC apartments are…

    Read more

  • AFBI Hillsborough

    AFBI Hillsborough

    Harvey Group and H&J Martin worked closely with AFBI staff on this flagship research facility in Hillsborough while installing experimental…

    Read more

  • P.S.

    Orangefield PS & Nursery

    Located in East Belfast, The new school contains a 14 classroom primary school and 2 class base nursery school at…

    Read more

  • Valley Leisure Centre

    Valley Leisure Centre

    Installations on this leisure centre included Plant room installation of air handling units, Duct work installation, removal of storage tanks,…

    Read more

  • Ivex Pharmaceuticals

    Ivex Pharmaceuticals

    This project was an extension to the IVR Production cleanroom. It was a challenging programme carried out safely in a…

    Read more

  • 127_lb_20

    Ritek Omagh Cleanroom

    This project provided a new cleanroom area for the manufacture of electronics. Electrical services included HV Transformers, Main LV Panel,…

    Read more

  • Phoenix Natural Gas

    Phoenix Natural Gas

    This office project was part of a major redevelopment scheme in Belfast which had a very challenging co-ordination exercise due…

    Read more

  • 1

    Seagate Springtown

    High level of co-ordination required, especially during the design development period to working drawing status. 26 fan tower units, each…

    Read more

  • Original Waterfront Hall

    Original Waterfront Hall

    Harvey Group used the original project to develop our specialist skills in pipe prefabrication, we called it the “Toast Rack”…

    Read more